The facade of the contemporary gallery building will be made up of large white panels of glass, which are being manufactured by Thiele in Germany. In February, mock-ups of the panels were made in order to test final fabricated components.
The goal of the mockup was to make sure the windload hooks on the back of the glass properly engaged the windload channel pins mounted to the stud wall. Images from the testing give a glimpse into the installation process that will take place here in Corning later this summer, when the panels will be placed on the facade.